Projects
A PARTIAL LIST OF VERIFIABLE PROJECTS
UNDERTAKEN BY ENVIRON-WASTE
NIGERIA LIMITED
01. Production of proposal and scope of work on Waste
Management System in accordance with ISO14001 principles for the Bonny Oil
Terminal
Duration: March - April 2000
Client: Shell Petroleum Development Company (SPDC)
02. Production of proposal for Waste Management System in
line with ISO14001 Environmental management Systems
Duration: April 2004
Client: Schlumberger Nigeria Limited, Trans Amadi Ind. L/Out, Port Harcourt
03. Design and construction of 2 oil/water separators
Duration: November 2001
Client: Baker Hughes (Inteq) Nig. Ltd., Trans Amadi Ind. L/Out, Port Harcourt
04. Monitoring of effluent from Baker Hughes facilities at
Trans Amadi and Onne FOT
Duration: January 2002 to present date
Client: Baker Hughes (Inteq) Nig. Ltd., Trans Amadi Ind. L/Out, Port Harcourt
05. Drilling of 10 boreholes for the monitoring of
underground water along the effluent channel and some chosen locations within
the Bonny Oil terminal including one hole drilled in Bonny town as a control
for SPDC at Bonny Oil Terminal
Duration: October 2001 to April 2002
Client: Shell Petroleum Development Company (SPDC)
06. Implementation of the contract for the Waste Management
System (11 locations) and the maintenance of Oil/Water separators at the Blue
Base and Drilling & Measurement Base
Duration: Jan 2002 to current date
Client: Schlumberger Nigeria Limited, Trans Amadi Ind. L/Out, Port Harcourt
07. Pest control contract at construction sites (LNG & LPG)
and National residents for CBI and JBN respectively in Nigeria LNG expansion
project, Bonny Island
Duration:
Client: Nigeria LNG
08. Remediation of two abandoned underground petrol storage
tanks location at the Blue Base of Schlumberger Nigeria Limited
Duration: June 2001
Client: Schlumberger Nigeria Limited, Trans Amadi Ind. L/Out, Port Harcourt
09. Remediation of oil spillage sites at Cawthorne Channel
flow station
Duration: April 2003
Client: Shell Petroleum Development Company (SPDC)
10. Clean-up and disposal of spilled drilling mud
Duration: April 2003
Client: Baker Hughes (Inteq) Nig. Ltd., Trans Amadi Ind. L/Out, Port Harcourt
11. Production of Environmental Audit Report
Duration:
Client: OKMAS Nig. Ltd., Port Harcourt
12. Production of Environmental Assessment Report (EAR) for
Baker Hughes Nig. Ltd. at her Onne FOT and FLT facilities
Duration: On-going
Client: Baker Hughes (Inteq) Nig. Ltd., Trans Amadi Ind. L/Out, Port Harcourt
13. Disposal of electromagnetic tapes and housing
Duration: On-going
Client: Western Geco Nig. Ltd., Port Harcourt
14. Consultant services: EIA protection for Oza/Ohuru seismic
survey activity
Duration:
Client:
|


 |